Amazon cover image
Image from Amazon.com
Image from Google Jackets

PROJECT SCHEDULING AND COST CONTROLLING THE BASELINE

By: Material type: TextTextPublication details: CENGAGE LEARNING; 2014Edition: 1 STDescription: 288 PISBN:
  • 9788131522363
Subject(s): DDC classification:
  • 658.404 JAM
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)